新增加一台操作站对中控dcs卡件进行软件授权要如何做呢?需要购买具有相应权限的硬件软件狗,工程师狗或操作员狗。如果需要oPc通讯连接,软件狗也需要有oPc通讯权限。
How to add a new operating station to authorize the software of the central control DCS card? You need to purchase hardware and software dogs, engineer dogs or operator dogs with corresponding permissions. If the OPC communication connection is required, the dongle also needs to have the OPC communication permission.
服务器配置可以通过结构配置软件中的“BackupProject”文件和高级“RestoreProject”进行备份和恢复。打开非常新的配置,点击菜单“通用信息”→“备份数据”,选择备份路径、名称、保存,即可备份配置。注意:本次备份操作不包括监控历史数据(如历史趋势、历史报表等)的备份,如果监控历史数据需要备份,只需将整个配置文件复制到移动存储即可。
The server configuration can be backed up and restored through the "backupproject" file and the advanced "restoreproject" in the fabric configuration software. Open the very new configuration, click the menu "general information" → "backup data", select the backup path, name and save to back up the configuration. Note: this backup operation does not include the backup of monitoring historical data (such as historical trend, historical report, etc.). If the monitoring historical data needs to be backed up, just copy the entire configuration file to the mobile storage.
此外,dcs系统对供电质量也有一定的要求。检修完毕后,直流电源应上电:1、确认外接电源是否稳定。如果在维护期间电压不稳定,请不要上电。测试外接电源电压是否满足198V-242V的要求。上电时先上主电源,再上操作站、控制柜、外配电柜(断电时反之)。
In addition, DCS system also has certain requirements for power supply quality. After maintenance, the DC power supply shall be powered on: 1. Confirm whether the external power supply is stable. Do not power on if the voltage is unstable during maintenance. Test whether the external power supply voltage meets the requirements of 198v-242v. Power on the main power supply first, and then the operation station, control cabinet and external distribution cabinet (vice versa in case of power failure).
浙大中控dcs卡件XP313
上电后dcs卡故障报警、电压故障报警、开关及网络检测、电源电压测试。使用万用表检查dcs的每个笼子的5V和24V电压。如果低于5V和24V,则不正常。对于电源质量的深入检测,需要使用示波器或电能质量分析仪进行检测分析。
After power on, DCS card fault alarm, voltage fault alarm, switch and network detection, power supply voltage test. Use a multimeter to check the 5V and 24V voltage of each cage of the DCS. If it is lower than 5V and 24V, it is abnormal. For in-depth detection of power quality, oscilloscope or power quality analyzer shall be used for detection and analysis.
浙大中控dcs卡件XP313专家建议:系统维护负责人应确认具备条件后再上电。应严格遵守上电步骤。
Zhejiang University central control DCS card xp313 experts suggest that the system maintenance director should confirm that the conditions are met before powering on. Power on procedures shall be strictly followed.
以上就是问题解答的相关内容了,希望能够帮助到大家,如对这一问题还存在任何疑问,都欢迎关注我们网站http://www.sdjkyqyb.com并咨询我们的工作人员,将竭诚为您服务。